Project Abstract
Commercial Project
The Whiting-Turner Contracting Company is inviting your firm to submit a
proposal for Construction
Management services for the renovation and new construction of a 23,600 square
foot education and research facility in the life sciences field located in the
ASC region 1 of the United States. The facility construction and renovation will
consist of steel framed construction, masonry façade with point supported glazed
wall entrance, extensive MEP systems and specialty equipment. The completed
facility will consist of a working basement, first floor and penthouse levels.
The surrounding area of the facility consists of a controlled environment that
will require to be maintained at all times during construction. Logistics,
coordination with contractors outside this scope (Owner controlled), and tenant
relationships will be key to a successful project.
It is the intention of Whiting-Turner to enter into a GMP contract with the
selected contractor who meets or exceeds the following criteria:
Project Specific Overall Written
Presentation 70%
Staffing Plan
Project Approach
Logistics and Sequencing Plan
CPM Scheduling
Cost Estimate
Safety Plan
Value Engineering
User/Tenant Interface Approach
Quality Control Plan
Project Specific Oral Presentation 30%
Total 100%
Note: The judges will be looking for
ethical, creative and innovative solutions to the project challenges,
knowledge of the contract documents, problem solving, coordination, quality
control, adherence to safety, budgeting,
scheduling methods, and communication skills. Innovation in the aforementioned
is expected, the utilization of boilerplate materials will be frowned upon and
will result in point deductions. The
complete project scope is under development and will be presented in the RFP and
contract documents the
day of the competition. Good luck and
have fun!